Price on request
Builder Price
Configuration1, 2, 3 BHK
Possession StatusCompleted
Overview
- Possession Start DateMar'25
- StatusCompleted
- Total Area2 Acres
- Total Launched apartments48
- Launch DateAug'22
- AvailabilityResale
- RERA IDPRM/KA/RERA/1251/308/PR/141022/005324
Salient Features
- Located 2 km from NH 44 and 1.4 km from the Hennagara Main Road
- Within a distance of 2.2 km, B.S Carmel Public School is present
- The Bommasandra Metro Station is located at a distance of 4.4 km
- Considered an industrial hub, the property is 2.9 km from the Bommasandra Industrial area
- Features an aerobic center, children's play area, Sand Bed Walkway, open sky gym, etc
Project Specifications
Fittings
Kitchen:Provision For Water Purifier and Exhaust Fan
Doors
Main:Flush Door
Upavan Phase 1 Floor Plans
—
- 1 Bedroom
- 1 Bathroom
- 1 Hall
Ma Sarada Upavan Phase 1 Amenities
Reflexology Park
Multipurpose Hall
Swimming Pool
Children's play area
Gymnasium
Badminton Court
Conference Room
Full Power Backup
Internal Roads
Lift(s)
Sewage Treatment Plant
Landscape Garden and Tree Planting
Water Conservation, Rain water Harvesting
Electrification(Transformer, Solar Energy etc)
Rain Water Harvesting
Upavan Phase 1 Gallery
Bommasandra Neighbourhood
Loading map…
- Kachanayakanahalli Bus Stop0.43 km
- Kachamaranahalli0.68 km
- H Hosahalli Bus Stop0.96 km
- Yarandahalli Bus Stop1.05 km
- Kittaganahalli Bus Stop1.54 km
Our Picks - Compare and choose
Loading picks…
About Ma Sarada Constructions Bangalore
- Total Projects2
- Ongoing Projects1
Similar Projects
Loading similar projects…