India's best property portal to buy property in India - Proptiger.com
New Launch
Possession : Jun'27
Rera
Vitrag Sector 6B Phase 2
Price on request
Builder Price
Configuration
2 BHK
Carpet Area1 sq M = 10.76 sq ft
760 - 959 sq ft
Possession Status
Launch
Overview
  • Possession Start Date
    Jun'27
  • Status
    Launch
  • Total Area
    2.78 Acres
  • Total Launched apartments
    168
  • Launch Date
    Dec'21
  • Availability
    New
  • RERA ID
    PR/GJ/GANDHINAGAR/GANDHINAGAR/Gandhinagar Urban Development Authority/RN318AA10218/280223

Project Specifications

Doors
Main:
Decorative Main Door
Internal:
Designer Doors
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Walls
Exterior:
Acrylic Paint
Interior:
Sand Faced Plaster
Toilets:
Ceramic Tiles Dado up to 7 Feet Height Above Platform
Kitchen:
Ceramic Tiles
Fittings
Kitchen:
Jaquar / Equivalent C. P. fittings
Toilets:
Branded CP Fittings & Sanitary Ware, Anti-Skid Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Kitchen
Windows:
Aluminium Powder Coated Windows
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
Vitrag Sector 6B Phase 2 Floor Plans
  • 2 BHK
-
Vitrag Sector 6B Phase 2 Amenities

About Vitrag Enterprise

  • Total Projects4
  • Ongoing Projects4

More projects by Vitrag Enterprise

Similar Projects

Developer Network

  • 400+
    Reputed Developers