India's best property portal to buy property in India - Proptiger.com
mobilesiteConversionButtonText
mobilesiteConversionCallButtonText

Poddar Riviera Phase II

Forest
₹ 32.00 L - ₹ 53.01 L
Builder Price
1, 2 BHK
Apartment
343 - 534 sq ft
Carpet Area1 sq M = 10.76 sq ft
Project Location
Ulhasnagar, Mumbai

Overview

  • Nov'26
    Possession Start Date
  • Under Construction
    Status
  • 338
    Total Launched apartments
  • Nov'19
    Launch Date
  • New
    Availability

Salient Features

  • Spread over a total area of 18.8 acres of land
  • In close proximity to schools, malls, hospitals, highways and the rest of the city.
  • River Facing 14,000 Sq.ft. Club House
  • 5.5 km away from Kalyan Railway Station

Poddar Riviera Phase II Floor Plans

  • 1 BHK
  • 2 BHK
Floor PlanCarpet AreaAgreement Price
(1BHK+1T)
₹ 32.00 L
Floor Plan
(1BHK+1T + Study Room)
₹ 43.00 L
Floor PlanCarpet AreaAgreement Price
 riviera-phase-ii Floor Plan Floor Plan
(2BHK+2T)
₹ 53.01 L
Report Error

Poddar Riviera Phase II Amenities

  • Intercom
  • Power Backup
  • Lift Available
  • CCTV
  • Gated Community
  • 24 X 7 Security
  • Car Parking
  • Rain Water Harvesting
  • Amphitheater
  • Banquet Hall
  • Children's play area
  • Closed Car Parking
  • Club House
  • Cricket Pitch
  • Gymnasium
  • Indoor Games
  • Jogging Track
  • Party Hall
  • Swimming Pool
  • Tennis Court
  • Fire Fighting System
  • Internal Roads
  • Sewage Treatment Plant
  • Sewage Treatment Plant
  • 24 Hours Water Supply
  • Terrace Party Area On Club
  • Shopping Mall
  • Outdoor Organic Farm Patch
  • Terrace Party Area On Club
  • Multipurpose Ground,
  • Open Air Gym
  • Giant Jenga, Giant Chess Play Area
  • Adult Pool
  • Basketball Court
  • 24 Hours Water Supply
  • Fire Fighting System
  • Utility Shops
  • Landscaping & Tree Planting
  • Aggregate area of recreational Open Space
  • Community Buildings
  • Electrical Meter Room, Sub-Station, Receiving Station
  • Energy management
  • Landscaping & Tree Planting
  • Open Parking
  • Solid Waste Management And Disposal
  • Storm Water Drains
  • Street Lighting
  • Water Conservation, Rain water Harvesting
  • Chess Board
  • Day Care Center
  • Table Tennis
  • Barbecue Area
  • Paved Compound
  • Carrom
  • Garbage Disposal
  • Jacuzzi
  • Lawn Tennis Court
  • Piped Gas Connection
  • Terrace Garden
  • Yoga/Meditation Area
  • Reflexology Park
  • Senior Citizen Siteout
  • Kid's Pool
  • Entrance Lobby
  • Multipurpose Hall
  • Fire Sprinklers

Poddar Riviera Phase II Specifications

Walls
Exterior:
Exterior Paint
Toilets:
Ceramic Tiles
Interior:
Putty on Walls
Kitchen:
Anti Skid Tiles Dado
Doors
Main:
Both Side Teak Veneered / Laminated Flush Door
Internal:
Both Side Teak Veneered / Laminated Flush Door
Others
Windows:
Aluminium Powder Coated Windows
Frame Structure:
Earthquake resistant structure
Wiring:
Concealed copper wiring
Switches:
Modular switches
Fittings
Kitchen:
Branded CP fittings
Toilets:
Good Quality CP Fittings of Jaquar or Equivalent
Flooring
Kitchen:
- Granite counter in kitchen area
Balcony:
Agglomerated Marble
Master Bedroom:
Agglomerated Marble
Other Bedroom:
Agglomerated Marble
Living/Dining:
Agglomerated Marble
Toilets:
Agglomerated Marble
Housing Premium

Payment Plans

Payment Plan

FAQs

NRIs ask this frequently
  • Do NRIs require consent of the Reserve Bank to buy immovable property in India?
    No, NRI's do not require permission to buy any immovable property in India other than agricultural/plantation property or a farmhouse.
  • Is there any limit on the number of housing properties that may be purchased by an NRI?
    There are no limits on the number of residential properties that may be bought by an NRI. However, repatriation (the process of converting a foreign currency into the currency of one’s own country) is allowed only in respect of two such properties.
Have any unanswered questions ?click here
Contact NRI Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347
Contact Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347

About Poddar Housing

Images for Project
  • 65
    Years of Experience
  • 17
    Total Projects
  • 7
    Ongoing Projects
Similar Projects

Discuss about Poddar Riviera Phase II

comment

Developer Network

  • 400+
    Reputed Developers
Disclaimer
PropTiger.com is not marketing this real estate project (“Project”) and is not acting on behalf of the developer of this Project. The Project has been displayed for information purposes only. The information displayed here is not provided by the developer and hence shall not be construed as an offer for sale or an advertisement for sale by PropTiger.com or by the developer.

The information and data published herein with respect to this Project are collected from publicly available sources. PropTiger.com does not validate or confirm the veracity of the information or guarantee its authenticity or the compliance of the Project with applicable law in particular the Real Estate (Regulation and Development) Act, 2016 (“Act”).
 Read Disclaimer
Proptiger.com only acts as a medium for advertisement / information content. We do not in any way facilitate and cannot be deemed to be facilitating any transaction between seller / developer and the visitors / users of our website. The details displayed on our website are for information purposes only. Information regarding real estate projects (including the property / project detail, listings, floor area, location, price etc.) are either third party content or sourced from public sources. Nothing contained herein shall be deemed to constitute any sort of legal advise, solicitation, marketing, offer of sale, invitation to offer, invitation to acquire etc. by Proptiger.com. Users of this website are hereby advised to exercise due diligence and to independently validate and verify all information about any property / project before deciding to purchase the same or taking any other action. Information on this website does not guarantee that the developer / project is registered under the Real Estate (Regulation and Development) Act, 2016 or is compliant with the same, and the same should also be verified independently.
Okay, Got It