India's best property portal to buy property in India - Proptiger.com

Kadam Vijaya Shrushti

Possession : Feb'19
Rera

Kadam Vijaya Shrushti

Price on request
Builder Price
Configuration
1, 2 BHK
Carpet Area1 sq M = 10.76 sq ft
483 - 880 sq ft
Possession Status
Completed
Overview
  • Possession Start Date
    Feb'19
  • Status
    Completed
  • Total Launched apartments
    40
  • Launch Date
    Nov'16
  • Availability
    Resale
  • RERA ID
    P52100004295
Approved for Home loans from following banks
  • HDFC (5244)
  • Axis Bank
  • PNB Housing
  • Indiabulls
  • Citibank
  • DHFL
  • L&T Housing (DSA_LOSOT)
  • IIFL
  • + 3 more banksshow less

Project Specifications

Doors
Main:
Decorative with Brass Fittings
Internal:
Wooden Frame and Flush Doors
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Walls
Exterior:
Sand Faced Plaster
Interior:
Oil Bound Distemper
Kitchen:
Designer Tiles Dado up to Lintel Level
Toilets:
Designer Tiles Dado
Fittings
Toilets:
CP fittings
Kitchen:
Granite platform with stainless steel sink
Others
Windows:
Aluminium Powder Coated Windows
Wiring:
Branded Concealed Copper Wiring with MCB / ELCB
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
Kadam Vijaya Shrushti Floor Plans
  • 1 BHK
  • 2 BHK
-
-
Kadam Vijaya Shrushti Amenities

About Kadam Constructions

  • Total Projects1
  • Ongoing Projects0

More projects by Kadam Constructions

Similar Projects

Developer Network

  • 400+
    Reputed Developers
All information, images, videos, specifications, and representations related to the project displayed on PropTiger.com are provided by the developer and may differ from the actual property. Users are advised to independentlyverify all project details, approvals, registrations, and compliance under applicable laws, including RERA, before making any purchase decision. Proptiger acts only as a channel partner developer defaults, non-compliance, or actions taken by authorities regarding the project or developer. By using the platform, users also consent to being contacted for feedback or relevant communication, with the option to opt out at any time....