India's best property portal to buy property in India - Proptiger.com

Twin Tower

Possession : Nov'23
Rera

Twin Tower

₹ 41.00 L - ₹ 68.67 L
Builder Price
Home Loan EMI starts at ₹ 31,787
Configuration
3 BHK
Builtup area1 sq M = 10.76 sq ft
1,000 - 1,675 sq ft
Possession Status
Under Construction
Avg. Price
₹ 4,100 sq.ft
Overview
  • Possession Start Date
    Nov'23
  • Status
    Under Construction
  • Total Area
    0.83 Acres
  • Launch Date
    Jan'18
  • Availability
    New and Resale
  • RERA ID
    PR/GJ/SURAT/SURAT CITY/SUDA/RAA02923/A1R/080120

Salient Features

  • Properties with 100% power backup available
  • Easily accessible to schools, educational institutes, shopping malls
Approved for Home loans from following banks
  • HDFC (5244)

Project Specifications

Flooring
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Vitrified Tiles
Other Bedroom:
- Vitrified tiles in common bedroom, children bedroom and kitchen
Kitchen:
Vitrified Flooring
Balcony:
Anti Skid Vitrified Tiles
Walls
Interior:
Emulsion Paint
Toilets:
Ceramic Tiles
Kitchen:
Ceramic Tiles
Exterior:
Long Lasting Paint
Others
Windows:
Aluminium Powder Coated Glazed Windows
Doors
Main:
Decorative Flush Door
Internal:
Designer Doors
Fittings
Kitchen:
Granite platform with stainless steel sink
Toilets:
Branded CP Fitting
Twin Tower Floor Plans
  • 3 BHK
₹ 41.00 L
Twin Tower Amenities

About Twin Enterprise

  • Total Projects1
  • Ongoing Projects1

More projects by Twin Enterprise

Developer Network

  • 400+
    Reputed Developers
All information, images, videos, specifications, and representations related to the project displayed on PropTiger.com are provided by the developer and may differ from the actual property. Users are advised to independentlyverify all project details, approvals, registrations, and compliance under applicable laws, including RERA, before making any purchase decision. Proptiger acts only as a channel partner developer defaults, non-compliance, or actions taken by authorities regarding the project or developer. By using the platform, users also consent to being contacted for feedback or relevant communication, with the option to opt out at any time....